TSH Construction Update: Pic of the manhole for sanitary sewer manhole beside the building and beginning to excavate for the parkade. Pit for main elevator. Lots of underground conduit for data and power lines into the mechanical room. Phase 2 floor is poured with many underslab plumbing and electrical conduits poking up. Phase 1 exterior and interior walls are standing.