Trochu Seniors Housing Construction update: Lots of metal is embedded in the concrete footings and foundation. 2” Styrofoam insulation is outside the foundation walls to help keep frost out. Phase 1 is mostly backfilled. Started backfilling Phase 2. Footings poured on Phase 3 and framing begun for foundation walls. Started digging trenches for Phase 4.