Exterior siding for Phase 1 and 3 are coming along. Pic of AC unit to be roof mounted. Pic of concrete block elevator shaft. 1st floor of Phase 2 framed. Starting on 2nd floor. Concrete block of 2nd elevator shaft in Phase 5 completed. Some framing on Phase 5. Pic of preparation of suspended concrete floor above parkade in Phase 6. Pic of framed walls within Phase 4 (mechanical area). Several pics of various states of interior on both floors within Phase 1 and 3. Electrical, plumbing, drywall, insulation, HVAC, interior framing all continuing to be developed